New Calendar Year 100, January 5th, Bai Zhizhan arrived at Puzhou Shipyard for the third day.
Busy for two days, it wasn't until last night that he had nailed down the most important task, which was the repair of the "Heng River" vessel.
Because Mast Harbor was closer to Puzhou, and the Domestic Fleet had made arrangements, the floating dock could arrive early, so the "Heng River" could enter the floating dock on the day of its arrival. As for when it could be repaired, that would depend on the extent of the damage and whether the repairs warrant additional remodeling projects.
In short, the shipyard would do everything in its power to repair the "Heng River" as soon as possible.